iCAM has delivered end-to-end electrical and automation systems across 10+ cement plants, including 7,000 I/O DCS systems and 100 MW TG synchronisation.
Every unplanned kiln stoppage or grinding unit failure costs money in lost production. Plants with predictive automation run longer between failures.
Power consumption in cement is 60–70% of variable cost. Without EMS and PEMS, plants run on fixed schedules rather than real-time optimisation.
Load balancing, TG synchronisation, and import/export controllers at 60–100 MW require engineering depth that most automation vendors don't carry. iCAM does.